Skip to main content

Shipping Construction and Quarry Machinery from Turkey to Kazakhstan

Crushers, screens, concrete-batching plant and machine parts — shipped dismantled in standard trucks and containers through Georgia and Azerbaijan and across the Caspian

Turkey flagTurkeyKazakhstan flagKazakhstan trade lane

Kazakhstan is building roads, housing and industrial sites and opening quarries to feed them, and a good share of the plant comes from Türkiye. In 2024 Türkiye sold Kazakhstan about $50 million of crushing, screening and concrete-mixing plant and about $38 million of parts for excavators, cranes and similar machines. Turkish makers of crushers, screens, washing plant and concrete-batching plant build for exactly the kind of sites Kazakh contractors run, and they sell complete installations rather than single machines.

This is heavy freight, and the route is overland. The plant loads in Türkiye, crosses Georgia and Azerbaijan, takes the ferry across the Caspian to Aktau or Kuryk, and continues by road or rail inside Kazakhstan. No leg crosses Russia, Belarus or Iran.

The shipment is carried out by Gianti Logistics, an independent Georgian company that is AGF's authorized representative in the region, with offices in Istanbul, Tbilisi, Poti, Baku and Almaty. The enquiry comes to AGF first: we screen the shipper, the consignee and the goods, then pass the file to Gianti, who quote and perform the transport. AGF has no office of its own in Türkiye or Kazakhstan.

Last reviewed: · By American Global Freights (AGF), an FMC-licensed NVOCC (OTI #031665NF) headquartered in Glendale, California, with our own offices in Foshan, China, and Paris, France.

Shipping Construction & Quarry Machinery from Turkey to Kazakhstan

A crushing or batching plant never ships as one piece. The manufacturer breaks it down into transport units — crusher, screen box, feeder, conveyors, cement silos, mixer, control cabin, steel structure — sized for standard equipment. Units travel in a standard 13.6 m tilt trailer (about 13.6 m long, 2.48 m wide and 2.65–2.75 m high inside; a mega trailer gives 3.00 m of height), on a standard flatbed trailer within legal dimensions, or in containers, as ordinary full or part loads.

Two limits decide the plan. The first is weight: steel plant and crusher wear parts are dense, so a truck reaches its weight limit, about 22–24 tonnes depending on the vehicle, long before the trailer is full. The second is size: a silo, a screen box or an assembled jaw crusher can be wider or taller than a standard trailer allows, so the manufacturer has to dismantle it further before it can travel. We ship machinery that fits a standard container or a standard truck. We do not handle out-of-gauge cargo — flat rack, open top, breakbulk or heavy-lift moves.

Parts under HS 8431, such as buckets, undercarriage, booms and wear parts, move palletized or crated in tilt trailers, as full or part loads.

  • Overland through Georgia and Azerbaijan, Caspian ferry to Aktau or Kuryk — never via Russia, Belarus or Iran
  • Standard tilt trailers, standard flatbeds and containers for dismantled units and parts
  • Full loads and part loads, so a consignment of spare parts does not have to wait for a full truck
  • Plant dismantled by the manufacturer into units that fit a standard truck or container
  • Dense steel reaches the truck's weight limit before its volume limit — loads are planned by weight
  • Transit depends on the ferry schedule, the season and the borders, and is confirmed at quoting

What Drives the Cost

  • How the manufacturer splits the plant: the number of transport units and how far each is dismantled
  • Equipment — a standard tilt trailer, a standard flatbed or a container — and full load or part load
  • Weight: dense plant and wear parts fill a truck by weight, so tonnage sets the number of trucks
  • The Caspian ferry leg and any waiting time for a sailing, particularly in winter
  • Where it delivers in Kazakhstan — a quarry or site far from Aktau adds a long inland leg
  • Unloading at the site: the lifting equipment there is not part of the trucking

HS Codes and Duty Notes

Classification guidance only — duty rates change and depend on your exact product. Codes are confirmed with the licensed customs representative at destination before you ship.

HS CodeProductsNotes
8474Machinery for sorting, screening, washing, crushing, grinding or mixing earth, stone and ores; concrete and mortar mixers and batching plantA complete plant is usually sold as one item and shipped as many units. The invoice, packing list and declaration should describe it the same way, unit by unit, or clearance in Kazakhstan becomes harder than it needs to be.
8431Parts for the machines of 8425 to 8430: buckets, booms, undercarriage, wear partsOnly parts made for these machines belong here. Bearings, hydraulic pumps, engines and electrical items classify under their own headings, and some of those headings are screened more closely.

Regulations and Compliance

EAEU machinery safety — TR CU 010/2011

Kazakhstan is a member of the Eurasian Economic Union, and machinery falls under the EAEU technical regulation on the safety of machinery and equipment, TR CU 010/2011, usually together with TR CU 004/2011 on low-voltage equipment and TR CU 020/2011 on electromagnetic compatibility for the electrical side. Most machinery takes a declaration of conformity; an annex to the regulation lists the types that need a certificate instead. Goods that have passed the assessment carry the EAC mark. Which document your plant or machine needs is checked for the product before shipment.

The applicant must be registered in the EAEU

A Turkish manufacturer cannot file the declaration or apply for the certificate on its own. The applicant has to be an entity registered in the EAEU, which in practice means the Kazakh buyer or a representative the manufacturer has there. Settle who it is in the purchase contract, because the conformity documents should exist before the plant arrives, not after.

Manuals and labels in Kazakh and Russian

Labels and rating plates must be in Kazakh and Russian, and the operating manual is required in both languages. Ask the manufacturer for them when you order: a translation commissioned after the machine has shipped holds up the paperwork that depends on it.

Customs duty and import VAT

Türkiye has no free trade agreement with the EAEU or with Kazakhstan, so there is no preferential rate to claim: the EAEU common customs tariff applies at its standard most-favoured-nation rates. Duty and import VAT are assessed by Kazakh customs on the declared goods and their value. We do not publish rates; duties and taxes are estimated at quoting.

Screening: end user and end use

Türkiye and Kazakhstan are both on the routes authorities watch for goods diverted to Russia. Before a shipment is accepted we confirm the shipper, the consignee, the end user and the end use. Complete plant for a named quarry or construction site is straightforward to confirm. Spare parts get the closest look, above all bearings, frequency converters and CNC controls, which appear on the list of items US and allied authorities treat as high priority. A shipment that cannot answer these questions is declined.

Door-to-Door Shipping Service

Send the enquiry to AGF with the manufacturer's packing list or drawings: dimensions and weight of each transport unit, where it loads in Türkiye, where it delivers in Kazakhstan, and who will use it. We screen the shipper, the consignee and the goods, then pass the file to Gianti Logistics, who quote and carry out the shipment. The quote names the company you contract with and confirms the transit.

Gianti plans the loads unit by unit and collects at the factory. The trucks cross into Georgia, run through Georgia and Azerbaijan under transit declarations, and take the Caspian ferry to Aktau or Kuryk.

In Kazakhstan the goods are declared under EAEU customs rules in the buyer's name, with the conformity documents already in hand, and delivered to the quarry or site by road or rail. Lifting equipment at the site is not part of the trucking, so the unloading plan and the site's capacity are confirmed before the trucks leave.

Frequently Asked Questions

How do I ship a crushing plant from Turkey to Kazakhstan?
As a set of transport units, not one piece. The manufacturer dismantles the plant into units that fit standard tilt trailers, standard flatbeds or containers. Everything moves overland through Georgia and Azerbaijan and across the Caspian by ferry to Aktau or Kuryk, then by road or rail to the site. Send us the packing list with dimensions and weights and the delivery address to start.
Which route does machinery take from Turkey to Kazakhstan?
Through Georgia and Azerbaijan, across the Caspian by ferry to Aktau or Kuryk, and on inside Kazakhstan by road or rail. Other carriers also run north through Russia or south through Iran. This lane uses neither, and does not cross Belarus.
How long does it take to ship a concrete batching plant to Kazakhstan?
We do not publish a standard transit time for this route. It depends on the ferry schedule, the season and the border queues; winter weather on the Caspian can hold a sailing. The transit is confirmed with the quote for your shipment.
Can an excavator or loader be trucked from Turkey to Kazakhstan?
No. Complete construction machines such as excavators, loaders, dozers and graders travel on low loaders as oversized loads, which we do not handle. Parts for them — buckets, undercarriage, booms and wear parts — travel palletized or crated in standard trailers, as full or part loads.
Does Turkish construction machinery need EAC certification in Kazakhstan?
It needs EAEU conformity documents. Machinery falls under TR CU 010/2011; most types take a declaration of conformity and some, listed in an annex, need a certificate. The applicant must be registered in the EAEU, the machine carries the EAC mark, and the manual and labels must be in Kazakh and Russian. A CE mark on its own does not meet this requirement.
Who actually moves the cargo?
Gianti Logistics, an independent Georgian company acting as AGF's authorized representative in the region. It runs its own tilt, container and flatbed trailers in full and part loads. You send the enquiry to AGF; we screen it and pass it to Gianti, who quote and perform.

Construction & Quarry Machinery is just one example. AGF ships whatever your business moves — on this lane and beyond. If your commodity isn't covered by one of our guides, tell us what you ship and we'll build the logistics around it.

Get a Quote: Construction & Quarry Machinery Turkey → Kazakhstan

Door-to-door quotes — freight, customs and delivery together, with duties, taxes and event-driven charges listed separately.

Request a Free Quote

Talk to us

Email Us

info@agfreights.com

France flagFrance Office

eu@agfreights.com

WhatsApp

USA flagUSA Office

+1 (818) 220-8800

China flagChina Office

+1 (818) 282-1821

China flagChina Office

+86 137 9463 2830

France flagFrance Office

+33 6 83 84 48 13

WeChat

China flagWeChat ID

AGF-CHINA

Scan to add us