Kazakhstan is building roads, housing and industrial sites and opening quarries to feed them, and a good share of the plant comes from Türkiye. In 2024 Türkiye sold Kazakhstan about $50 million of crushing, screening and concrete-mixing plant and about $38 million of parts for excavators, cranes and similar machines. Turkish makers of crushers, screens, washing plant and concrete-batching plant build for exactly the kind of sites Kazakh contractors run, and they sell complete installations rather than single machines.
This is heavy freight, and the route is overland. The plant loads in Türkiye, crosses Georgia and Azerbaijan, takes the ferry across the Caspian to Aktau or Kuryk, and continues by road or rail inside Kazakhstan. No leg crosses Russia, Belarus or Iran.
The shipment is carried out by Gianti Logistics, an independent Georgian company that is AGF's authorized representative in the region, with offices in Istanbul, Tbilisi, Poti, Baku and Almaty. The enquiry comes to AGF first: we screen the shipper, the consignee and the goods, then pass the file to Gianti, who quote and perform the transport. AGF has no office of its own in Türkiye or Kazakhstan.
Last reviewed: · By American Global Freights (AGF), an FMC-licensed NVOCC (OTI #031665NF) headquartered in Glendale, California, with our own offices in Foshan, China, and Paris, France.
Shipping Construction & Quarry Machinery from Turkey to Kazakhstan
A crushing or batching plant never ships as one piece. The manufacturer breaks it down into transport units — crusher, screen box, feeder, conveyors, cement silos, mixer, control cabin, steel structure — sized for standard equipment. Units travel in a standard 13.6 m tilt trailer (about 13.6 m long, 2.48 m wide and 2.65–2.75 m high inside; a mega trailer gives 3.00 m of height), on a standard flatbed trailer within legal dimensions, or in containers, as ordinary full or part loads.
Two limits decide the plan. The first is weight: steel plant and crusher wear parts are dense, so a truck reaches its weight limit, about 22–24 tonnes depending on the vehicle, long before the trailer is full. The second is size: a silo, a screen box or an assembled jaw crusher can be wider or taller than a standard trailer allows, so the manufacturer has to dismantle it further before it can travel. We ship machinery that fits a standard container or a standard truck. We do not handle out-of-gauge cargo — flat rack, open top, breakbulk or heavy-lift moves.
Parts under HS 8431, such as buckets, undercarriage, booms and wear parts, move palletized or crated in tilt trailers, as full or part loads.
- Overland through Georgia and Azerbaijan, Caspian ferry to Aktau or Kuryk — never via Russia, Belarus or Iran
- Standard tilt trailers, standard flatbeds and containers for dismantled units and parts
- Full loads and part loads, so a consignment of spare parts does not have to wait for a full truck
- Plant dismantled by the manufacturer into units that fit a standard truck or container
- Dense steel reaches the truck's weight limit before its volume limit — loads are planned by weight
- Transit depends on the ferry schedule, the season and the borders, and is confirmed at quoting
What Drives the Cost
- How the manufacturer splits the plant: the number of transport units and how far each is dismantled
- Equipment — a standard tilt trailer, a standard flatbed or a container — and full load or part load
- Weight: dense plant and wear parts fill a truck by weight, so tonnage sets the number of trucks
- The Caspian ferry leg and any waiting time for a sailing, particularly in winter
- Where it delivers in Kazakhstan — a quarry or site far from Aktau adds a long inland leg
- Unloading at the site: the lifting equipment there is not part of the trucking
HS Codes and Duty Notes
Classification guidance only — duty rates change and depend on your exact product. Codes are confirmed with the licensed customs representative at destination before you ship.
| HS Code | Products | Notes |
|---|---|---|
| 8474 | Machinery for sorting, screening, washing, crushing, grinding or mixing earth, stone and ores; concrete and mortar mixers and batching plant | A complete plant is usually sold as one item and shipped as many units. The invoice, packing list and declaration should describe it the same way, unit by unit, or clearance in Kazakhstan becomes harder than it needs to be. |
| 8431 | Parts for the machines of 8425 to 8430: buckets, booms, undercarriage, wear parts | Only parts made for these machines belong here. Bearings, hydraulic pumps, engines and electrical items classify under their own headings, and some of those headings are screened more closely. |
Regulations and Compliance
EAEU machinery safety — TR CU 010/2011
Kazakhstan is a member of the Eurasian Economic Union, and machinery falls under the EAEU technical regulation on the safety of machinery and equipment, TR CU 010/2011, usually together with TR CU 004/2011 on low-voltage equipment and TR CU 020/2011 on electromagnetic compatibility for the electrical side. Most machinery takes a declaration of conformity; an annex to the regulation lists the types that need a certificate instead. Goods that have passed the assessment carry the EAC mark. Which document your plant or machine needs is checked for the product before shipment.
The applicant must be registered in the EAEU
A Turkish manufacturer cannot file the declaration or apply for the certificate on its own. The applicant has to be an entity registered in the EAEU, which in practice means the Kazakh buyer or a representative the manufacturer has there. Settle who it is in the purchase contract, because the conformity documents should exist before the plant arrives, not after.
Manuals and labels in Kazakh and Russian
Labels and rating plates must be in Kazakh and Russian, and the operating manual is required in both languages. Ask the manufacturer for them when you order: a translation commissioned after the machine has shipped holds up the paperwork that depends on it.
Customs duty and import VAT
Türkiye has no free trade agreement with the EAEU or with Kazakhstan, so there is no preferential rate to claim: the EAEU common customs tariff applies at its standard most-favoured-nation rates. Duty and import VAT are assessed by Kazakh customs on the declared goods and their value. We do not publish rates; duties and taxes are estimated at quoting.
Screening: end user and end use
Türkiye and Kazakhstan are both on the routes authorities watch for goods diverted to Russia. Before a shipment is accepted we confirm the shipper, the consignee, the end user and the end use. Complete plant for a named quarry or construction site is straightforward to confirm. Spare parts get the closest look, above all bearings, frequency converters and CNC controls, which appear on the list of items US and allied authorities treat as high priority. A shipment that cannot answer these questions is declined.
Door-to-Door Shipping Service
Send the enquiry to AGF with the manufacturer's packing list or drawings: dimensions and weight of each transport unit, where it loads in Türkiye, where it delivers in Kazakhstan, and who will use it. We screen the shipper, the consignee and the goods, then pass the file to Gianti Logistics, who quote and carry out the shipment. The quote names the company you contract with and confirms the transit.
Gianti plans the loads unit by unit and collects at the factory. The trucks cross into Georgia, run through Georgia and Azerbaijan under transit declarations, and take the Caspian ferry to Aktau or Kuryk.
In Kazakhstan the goods are declared under EAEU customs rules in the buyer's name, with the conformity documents already in hand, and delivered to the quarry or site by road or rail. Lifting equipment at the site is not part of the trucking, so the unloading plan and the site's capacity are confirmed before the trucks leave.
Frequently Asked Questions
How do I ship a crushing plant from Turkey to Kazakhstan?
Which route does machinery take from Turkey to Kazakhstan?
How long does it take to ship a concrete batching plant to Kazakhstan?
Can an excavator or loader be trucked from Turkey to Kazakhstan?
Does Turkish construction machinery need EAC certification in Kazakhstan?
Who actually moves the cargo?
Construction & Quarry Machinery is just one example. AGF ships whatever your business moves — on this lane and beyond. If your commodity isn't covered by one of our guides, tell us what you ship and we'll build the logistics around it.