Kazakhstan grows wheat on a very large scale and is investing in processing it at home, along with dairy, meat, oilseeds, confectionery and drinks. Much of the equipment comes from Türkiye, whose manufacturers build flour mills, bakery and confectionery lines, and filling and packaging machines. In 2024 Türkiye sold Kazakhstan about $35 million of packaging and bottling machinery and about $25 million of flour-milling and grain-processing machinery.
A line is a project, not a parcel: dozens of machines, conveyors, silos, control cabinets and steel structure that must arrive complete and in an order the installers can use. It moves overland, from Türkiye through Georgia and Azerbaijan, by ferry across the Caspian to Aktau or Kuryk, and on by road or rail inside Kazakhstan. No leg crosses Russia, Belarus or Iran.
The shipment is carried out by Gianti Logistics, an independent Georgian company that is AGF's authorized representative in the region, with offices in Istanbul, Tbilisi, Poti, Baku and Almaty. The enquiry comes to AGF first: we screen the shipper, the consignee and the goods, then pass the file to Gianti, who quote and perform the transport. AGF has no office of its own in Türkiye or Kazakhstan.
Last reviewed: · By American Global Freights (AGF), an FMC-licensed NVOCC (OTI #031665NF) headquartered in Glendale, California, with our own offices in Foshan, China, and Paris, France.
Shipping Food Processing & Packaging Lines from Turkey to Kazakhstan
Most of a line fits standard equipment. A 13.6 m tilt trailer is about 13.6 m long, 2.48 m wide and 2.65–2.75 m high inside, and a mega trailer gives 3.00 m of height, which takes most fillers, packers, roller mills, sifters and ovens once the manufacturer has split them into modules. The tilt opens from the side and the top, so machines can be loaded by crane or forklift rather than dragged in from the rear.
What does not fit a tilt trailer as built is planned with the manufacturer: silos and bins, long conveyors and tall process vessels have to be supplied in sections that fit a standard tilt or flatbed trailer within legal dimensions. We ship machinery that fits a standard container or a standard truck. We do not handle out-of-gauge cargo — flat rack, open top, breakbulk or heavy-lift moves. A line therefore travels as several trucks, and the sequence matters. Structure and large vessels are usually wanted on site first, machines next, and control cabinets and instruments last, when the building is closed and dry.
The machinery itself is the fragile part. Stainless surfaces mark easily, control cabinets and servo drives do not tolerate moisture or shock, and the route includes a sea crossing and a cold delivery end for much of the year. Crating, moisture protection and clear lifting points are agreed with the manufacturer before anything is packed.
- Overland through Georgia and Azerbaijan, Caspian ferry to Aktau or Kuryk — never via Russia, Belarus or Iran
- Standard and mega tilt trailers for modules; standard flatbeds for sectioned silos, conveyors and vessels within legal dimensions
- Full loads for a line, part loads for a single machine or a spare-parts consignment
- Arrival sequence planned against the installation programme, not the factory's dispatch order
- Control cabinets and drives crated and protected against moisture and shock
- Transit depends on the ferry schedule, the season and the borders, and is confirmed at quoting
What Drives the Cost
- The number of trucks, which follows from how the manufacturer splits the line into modules
- How far silos, conveyors and vessels have to be split to fit standard trailers
- Crating and moisture protection for cabinets, drives and stainless equipment
- Whether the line ships at once or in phases to match the installation programme
- The Caspian ferry leg and any waiting time for a sailing, particularly in winter
- Where the plant is — the grain regions of northern Kazakhstan are a long inland leg from Aktau
- Offloading and positioning at the plant, which are not part of the trucking
HS Codes and Duty Notes
Classification guidance only — duty rates change and depend on your exact product. Codes are confirmed with the licensed customs representative at destination before you ship.
| HS Code | Products | Notes |
|---|---|---|
| 8422 | Machinery for filling, closing, sealing, capping and labelling bottles, cans, bags and boxes; other packing and wrapping machinery; dishwashing machines | A filling line combines machines that could each classify on their own. Describe the line coherently, with a unit-by-unit packing list, so the declaration matches what is in the trucks. |
| 8437 | Machines for cleaning, sorting or grading seed and grain; machinery for milling and working cereals | A complete flour mill is usually sold as one contract and shipped as many units over several trucks. Silos, conveyors and steel structure shipped with it may classify under their own headings. |
| 8438 | Machinery for the industrial preparation of food and drink: bakery, confectionery, meat, fruit and vegetable processing | Ovens, refrigeration units, pumps and control cabinets supplied with a line often classify separately from the main machines. Ask the manufacturer for the HS code of each unit, not one code for the contract. |
Regulations and Compliance
EAEU machinery safety — TR CU 010/2011
Kazakhstan is a member of the Eurasian Economic Union. Food-processing, milling and packaging machinery falls under the EAEU technical regulation on the safety of machinery and equipment, TR CU 010/2011, usually together with TR CU 004/2011 on low-voltage equipment and TR CU 020/2011 on electromagnetic compatibility for the electrical side. Most machinery takes a declaration of conformity; an annex lists the types that need a certificate. Goods that have passed the assessment carry the EAC mark. Which document applies to each machine in the line is checked before shipment.
Other technical regulations on the same line
A processing line is rarely covered by one regulation. Steam boilers and vessels working under pressure fall under the EAEU regulation on pressure equipment, TR CU 032/2013, and need a declaration or a certificate depending on the product. Any further requirement for a particular machine, including for surfaces in contact with food, is checked for your product before shipment rather than assumed.
The applicant must be registered in the EAEU
The Turkish manufacturer cannot file the declaration or apply for the certificate on its own. The applicant has to be an entity registered in the EAEU — in practice the Kazakh buyer or a representative the manufacturer has there. Put it in the purchase contract: a line that arrives without conformity documents can be delivered but not lawfully put to work.
Manuals and labels in Kazakh and Russian
Labels and rating plates must be in Kazakh and Russian, and operating manuals are required in both languages. For a line with dozens of machines that is a real translation job, so agree it with the manufacturer at order stage.
Customs duty and import VAT
Türkiye has no free trade agreement with the EAEU or with Kazakhstan, so the EAEU common customs tariff applies at its standard most-favoured-nation rates, with no preferential rate to claim. Duty and import VAT are assessed by Kazakh customs. We do not publish rates; duties and taxes are estimated at quoting.
Screening: end user and end use
Türkiye and Kazakhstan are both on the routes authorities watch for goods diverted to Russia. Before a shipment is accepted we confirm the shipper, the consignee, the end user and the end use. A complete line for a named mill, dairy or bottling plant is straightforward to confirm. Spares get the closest look, above all bearings, frequency converters and CNC controls, which are on the list of items US and allied authorities treat as high priority. A shipment that cannot answer these questions is declined.
Door-to-Door Shipping Service
Send the enquiry to AGF with the manufacturer's packing list or layout: each module's dimensions and weight, where the line loads in Türkiye, the plant it is going to in Kazakhstan, and the installation dates. We screen the shipper, the consignee and the goods, then pass the file to Gianti Logistics, who quote and carry out the shipment. The quote names the company you contract with and confirms the transit.
Gianti plans the trucks against the installation sequence and collects at the factory. The loads cross Georgia and Azerbaijan under transit declarations and take the Caspian ferry to Aktau or Kuryk.
In Kazakhstan the goods are declared under EAEU customs rules in the buyer's name, with the conformity documents in hand, and delivered by road or rail to the plant. Offloading is agreed beforehand: lifting equipment at the plant is not part of the trucking.
Frequently Asked Questions
How do I ship a flour mill from Turkey to Kazakhstan?
Can a bottling or packaging line be shipped by truck to Kazakhstan?
How long does shipping from Turkey to Kazakhstan take?
Does Turkish food machinery need an EAC declaration in Kazakhstan?
Can I ship a single machine or spare parts instead of a whole line?
Who carries out the shipment?