Pumps, valves and filters are among the largest machinery lines Türkiye sells to Kazakhstan. In 2024 the trade was worth about $75 million in filtering and purifying machinery, about $63 million in pumps and about $62 million in valves. The buyers are the oil and gas fields and processing plants of western Kazakhstan, city water and wastewater utilities, heating networks, mines and factories.
The freight ranges from pallets of small valves to skid-mounted pump sets and filter vessels several metres long. All of it moves overland: from Türkiye through Georgia and Azerbaijan, by ferry across the Caspian to Aktau or Kuryk, and on by road or rail inside Kazakhstan. No leg crosses Russia, Belarus or Iran. The Caspian ports sit in the west of the country, where much of the oil and gas demand is.
The shipment is carried out by Gianti Logistics, an independent Georgian company that is AGF's authorized representative in the region, with offices in Istanbul, Tbilisi, Poti, Baku and Almaty. The enquiry comes to AGF first: we screen the shipper, the consignee and the goods, then pass the file to Gianti, who quote and perform the transport. AGF has no office of its own in Türkiye or Kazakhstan.
Last reviewed: · By American Global Freights (AGF), an FMC-licensed NVOCC (OTI #031665NF) headquartered in Glendale, California, with our own offices in Foshan, China, and Paris, France.
Shipping Pumps, Valves & Filtration Equipment from Turkey to Kazakhstan
Most of this cargo travels in a standard 13.6 m tilt trailer, which has floor space for 33 euro pallets. Space is rarely the limit, though. Cast and forged valves, pump casings and steel filter housings are dense, and a truck reaches its weight limit, about 22–24 tonnes depending on the vehicle, well before the trailer looks full. Loads are planned by weight, and heavy pieces are spread along the floor rather than stacked.
Because orders are often smaller than a truck, part loads matter on this lane. Gianti runs both full and part loads, so a few crates of valves or a single pump skid can travel without paying for a whole trailer. Larger items — skid-mounted pump stations, long vertical pumps, filter vessels and separator units — travel on standard flatbed trailers when they are within legal dimensions and weights. We ship machinery that fits a standard container or a standard truck. We do not handle out-of-gauge cargo — flat rack, open top, breakbulk or heavy-lift moves.
Packing does much of the work. Flanges and threaded ends are capped, machined faces are protected against corrosion, pump shafts are secured, and instruments and control panels are crated separately. The route includes a sea crossing and, for much of the year, cold weather at the delivery end, so equipment should be drained and preserved by the manufacturer before it is packed.
- Overland through Georgia and Azerbaijan, Caspian ferry to Aktau or Kuryk — never via Russia, Belarus or Iran
- Full loads and part loads in standard tilt trailers for palletized and crated equipment
- Standard flatbeds for pump skids, filter vessels and other large units within legal dimensions
- Dense castings reach the truck's weight limit before its volume limit — loads are planned by weight
- Flanges capped, machined surfaces preserved, panels and instruments crated separately
- Transit depends on the ferry schedule, the season and the borders, and is confirmed at quoting
What Drives the Cost
- Weight more than volume: dense castings set the number of trucks
- Full load or part load, and how many collection points there are in Türkiye
- Whether any unit needs a flatbed rather than a tilt trailer
- Crating and preservation, particularly for equipment that will wait at site before installation
- The Caspian ferry leg and any waiting time for a sailing, particularly in winter
- Where it delivers — western Kazakhstan near the Caspian ports, or a long inland leg to Almaty, Astana or Shymkent
- The conformity documents, which the buyer or the manufacturer's EAEU representative must arrange
HS Codes and Duty Notes
Classification guidance only — duty rates change and depend on your exact product. Codes are confirmed with the licensed customs representative at destination before you ship.
| HS Code | Products | Notes |
|---|---|---|
| 8413 | Pumps for liquids — centrifugal, submersible, positive-displacement, dosing — and their parts | A pump shipped with its motor, baseplate and control panel as one set is usually declared as the pump. Motors, drives and panels shipped on their own classify separately, and frequency converters are screened closely. |
| 8481 | Taps, cocks and valves for pipes, vessels and tanks: gate, globe, ball, butterfly, check, safety and control valves | Describe the type, size, pressure class and material on the invoice. Actuators shipped separately may classify under their own heading. |
| 8421 | Filtering and purifying machinery for liquids and gases; centrifuges; parts and filter elements | The heading covers everything from a cartridge filter to a complete water-treatment package. A package should be declared coherently, unit by unit, with the tanks, pumps and panels that belong to it. |
Regulations and Compliance
EAEU machinery safety — TR CU 010/2011
Kazakhstan is a member of the Eurasian Economic Union. Pumps, filtration units and other machinery fall under the EAEU technical regulation on the safety of machinery and equipment, TR CU 010/2011, usually together with TR CU 004/2011 on low-voltage equipment and TR CU 020/2011 on electromagnetic compatibility where there are motors and controls. Most machinery takes a declaration of conformity; an annex lists the types that need a certificate. Goods that have passed the assessment carry the EAC mark. Which document applies is checked for your product before shipment.
Pressure equipment — TR CU 032/2013
Filter housings, separator vessels and other equipment working under pressure can also fall under the EAEU technical regulation on pressure equipment, TR CU 032/2013. One package can therefore be within the scope of more than one regulation, and needs a declaration or a certificate depending on the product. Buyers who assume one document covers a whole skid often find out otherwise at commissioning, so we raise it at enquiry.
The applicant must be registered in the EAEU
The Turkish manufacturer cannot file the declaration or apply for the certificate on its own. The applicant has to be an entity registered in the EAEU — in practice the Kazakh buyer or a representative the manufacturer has there. Agree who it is in the purchase contract, so the documents exist before the goods arrive.
Manuals and labels in Kazakh and Russian
Labels and nameplates must be in Kazakh and Russian, and operating manuals are required in both languages. Ask the manufacturer to supply them with the order rather than after dispatch.
Customs duty and import VAT
Türkiye has no free trade agreement with the EAEU or with Kazakhstan, so the EAEU common customs tariff applies at its standard most-favoured-nation rates, with no preferential rate to claim. Duty and import VAT are assessed by Kazakh customs. We do not publish rates; duties and taxes are estimated at quoting.
Screening: end user and end use
Türkiye and Kazakhstan are both on the routes authorities watch for goods diverted to Russia, and equipment for oil and gas is looked at more closely than most. Before a shipment is accepted we confirm the shipper, the consignee, the end user and the end use: which field, plant or utility the equipment is for. Spares get the closest look, above all bearings, frequency converters and CNC controls, which are on the list of items US and allied authorities treat as high priority. A shipment that cannot answer these questions is declined.
Door-to-Door Shipping Service
Send the enquiry to AGF with the packing list — pieces, dimensions, weights — the loading point in Türkiye, the delivery point in Kazakhstan, and the end user and what the equipment is for. We screen the shipper, the consignee and the goods, then pass the file to Gianti Logistics, who quote and carry out the shipment. The quote names the company you contract with and confirms the transit.
Gianti collects from the manufacturer or from several suppliers, as a full or a part load, and carries the cargo through Georgia and Azerbaijan under transit declarations to the Caspian ferry for Aktau or Kuryk.
In Kazakhstan the goods are declared under EAEU customs rules in the buyer's name, with the conformity documents in hand, and delivered by road or rail to the plant, field base or warehouse. For heavy skids and vessels the offloading method is agreed in advance: lifting equipment at the delivery point is not part of the trucking.
Frequently Asked Questions
How do I ship pumps or valves from Turkey to Kazakhstan?
Can I send a part load of valves from Istanbul to Almaty or Atyrau?
Do Turkish pumps and valves need EAC documents for Kazakhstan?
Is there import duty on Turkish equipment in Kazakhstan?
Does the route from Turkey to Kazakhstan go through Russia or Iran?
Why do you ask who the end user is?
Pumps, Valves & Filtration Equipment is just one example. AGF ships whatever your business moves — on this lane and beyond. If your commodity isn't covered by one of our guides, tell us what you ship and we'll build the logistics around it.