Importing Machinery into the USA
Compare machinery origins on transit, duty exposure and how the machine ships — then go deeper with each origin guide
Machinery is bought on specification first and origin second, but the origin still changes the landed cost. Chinese CNC routers, fiber lasers, press brakes and production equipment sell at a fraction of Western pricing and carry Section 301 tariffs on many lines; German and Belgian equipment costs more at the factory, usually enters at a zero or low base rate plus the current surcharge on EU goods, and crosses to the East Coast in 10–14 days.
What decides whether an imported machine actually runs is largely the same everywhere: crating that survives the voyage, a mode that fits the crated dimensions, and electrical work and certification that US inspectors accept. This page compares the origins we ship from and sets out the US rules that apply to every machine. Each row links to a detailed guide.
Compare origins for machinery
| Origin | Transit | Duty exposure | Typical load |
|---|---|---|---|
| About 2–3 weeks to Los Angeles from South China; longer to the East Coast | Low-to-moderate base rates; Section 301 on many Chinese machinery lines | Crated in a 20ft or 40ft by weight distribution; flat rack or open top when oversized | |
| About 2–3 weeks to Los Angeles from South China; longer to the East Coast | Low-to-moderate base rates under heading 8465; Section 301 on many Chinese machinery lines | 40ft: a crated 1325 or 1530 router (2–4 tonnes); flat rack for larger nesting cells | |
| Pacific crossing, confirmed per booking | Low base rates on most machine tools; Section 301 varies by line; FDA laser rules on laser cutters | Weight before volume — brakes and machining centers can hit payload first; 6m+ lasers go flat rack | |
| 10–14 days on the water from Hamburg or Bremerhaven to the East Coast; 20–25 days to the West Coast | Zero or low base rates on many capital-equipment lines, plus the current surcharge on EU goods | Crated in standard or high-cube containers within gauge; flat rack, open top or breakbulk above it | |
| 10–14 days on the water from Antwerp to the East Coast; 3–4 weeks door to door | Low or zero base rates on most capital equipment, plus the current surcharge on EU goods | Container, flat rack or breakbulk by dimensions; multi-supplier consolidation through Antwerp | |
| 9–22 days Genoa/La Spezia to New York; about 35 days to Los Angeles via Panama | Zero or low base rates topped up to 10% all-in for EU goods; listed Section 232 metals derivatives pay on full value, no EU cap | Crated in standard, high-cube or open-top containers; flat rack or breakbulk when out of gauge | |
| About 11–20 days Yokohama or Nagoya to Los Angeles/Long Beach; 25–38 days to New York | Machining centers and robots on the Section 232 temporary reduction list to end-2027; most other machine tools 12.5% all-in under the Section 301 layer | Compact machines in 20ft/40ft on skids, VCI-wrapped; open top or flat rack above container height | |
| About 21–23 days from Cai Mep–Thi Vai to Los Angeles/Long Beach; direct Hai Phong services for the north | Low base rates plus the 12.5% Section 301 layer on most lines; Section 232 on steel, aluminum and copper content; origin by substantial transformation | 20ft for dense transformers and gensets; crated 40ft; flat rack or open top when oversized | |
| Parts by air from CDG in days; machinery 9–16 days Le Havre–New York | Certified civil-aircraft parts duty-free and outside the Section 301 layer; machinery topped up to 10% all-in plus any Section 232 metals duty | Crated within gauge; flat rack, open top or breakbulk above it |
Planning guidance only — rates, surcharges and transits change, and every shipment is quoted on its own facts.
US rules that apply whatever the origin
Section 301 and the EU surcharge
Chinese machinery pays its normal duty plus Section 301 tariffs on many lines, and the Section 301 status of a 10-digit HTS code has changed repeatedly. Most German and Belgian capital equipment carries a zero or low base rate with the current surcharge on EU goods on top. Classification decides both, so our licensed customs brokers confirm the total for your exact code before you order.
Section 232 on steel and aluminum — every origin, no EU cap
Section 232 tariffs on steel and aluminum reach beyond mill products to machinery lines listed as derivatives, whatever the origin. The EU's 15% all-in cap covers cars, auto parts, upholstered wooden furniture and kitchen cabinets — not steel and aluminum, which carry their own rates — so a German or Belgian machine on the list is not protected by it. Whether your line is listed, and how the duty is assessed, is confirmed at quoting.
Electrical approval — a CE mark is not a US listing
Machines built for Chinese or European grids often arrive with control panels, voltage and frequency that US inspectors reject, and a CE mark is a European declaration rather than a US listing. Order the machine with a UL 508A-style panel and your shop's voltage and phase, and budget for an NRTL field evaluation (UL or ETL), which many jurisdictions require before the machine can be operated or insured.
Lasers and engines
Laser cutting and marking machines are radiation-emitting electronic products under the federal laser performance standard (21 CFR 1040): the manufacturer certifies compliance, the machine needs correct labels and interlocks, and reporting obligations apply. Machines with a combustion engine — generators, forklifts, construction equipment — need an EPA-certified engine, and non-certified engines are refused entry. Both are checked before purchase, not at the port.
Used machinery, valuation and crating
Used machines need clean, ISPM-15 compliant crating and realistic valuation support. For any machine, assists, tooling, software and installation services can affect the dutiable value, and tooling and spares shipped alongside are declared as their own lines. Engineered crating, VCI wrapping and desiccants are what keep rails, spindles and electronics intact through an ocean voyage.
Entry, bond and ISF
Commercial shipments need an importer of record, a customs bond and, by sea, an ISF filed before loading at origin. Our licensed customs brokers file the entry; AGF coordinates crating checks, the ocean booking, heavy trucking and rigging door to door.
Frequently Asked Questions
What is the import duty on machinery from China?
Can I import used machinery into the USA?
Does a CE-marked machine meet US requirements?
How is oversized machinery shipped to the USA?